Friday, June 16, 2017

June 16 - Porch, Pillars and Meeting

Back to June 9 -
Through the wonders of electronics, we have the ability to turn back time. Even though the porch slab has already been poured, we are able to step back to look at events preceding the pour, back to Friday, June 9. Return with us now to that thrilling day of yesterweek, to see the preparation for the pour.

Bob (notice the return of the yellow hat after a winter-long absence), pounds in a stake for supporting the slab form and at the same time teaches Felix about trust.
Sam drives in a stake using an even bigger hammer, relying on mother earth to hold the stake in place while being sunk.

Loren, Wayne and Jacob sharpen up their fencing skills. At the same time they are laying in reinforcement for smaller pads, like the one that will hold the air conditioning units.

Wayne, Tim and Bob add color as well as useful work to the evening.

It takes two Sams to level the form.
Troy and Sam carefully measure the form to assure the proper height. My dad used to tell me that two heads are better than one, even if one of them is a cabbage.


With all the components measured, leveled and with the rebar tied and propped up, the slab is ready to be poured.

Unveiling the Pillars - 
With the speed of electricity, we leap ahead to Monday, having previously reported on the big concrete pour of Saturday.
Sonny returns to inspect the pillars and to apply the finish coat which makes the rather coarse concrete a beautiful, decorative work of art.
The forms were made with a cross on the inside which left the impression on the concrete pillar. There was some concern that the impression may be damaged when the forms were removed. Sonny looks on with keen interest while Sam pries off the wooden form.
The forms came off slick as grease without any damage to the impression. Sam lets out a sigh of relief while Sonny talks on the phone.

First any residual oil must be removed so the finish coat sticks to the concrete. The oil allowed the form to come off without sticking. Now with the form off, we want the finish coat to stick tight to the concrete.
The artist mixes up his magic coating. It looks like sour cream is an important ingredient in the compound.

Painstakingly, the sauce is troweled over the pillar, filling the voids and providing a uniform finish. Sonny estimates the thickness of the finished coat to be about 1/128th of an inch.
Sam was eventually allowed to use a small knife to trim the grooves that make up the cross.

The finished pillar with a decorative cross on each face.













Congregation Update Meeting -









Wednesday evening, in lieu of Bible class, the congregation met inside the new church to get a thorough update on the building project.

Don Keskey presented the agenda and the financial report. I understood the agenda.
Bob, without the yellow hat, went over a list of tasks remaining. He assured the congregation that there is still work to be done.


Janelle reviewed the work of the design committee. Among the many tasks for the committee is recommending the exterior colors and pattern for the building. The congregation agreed that color on the outside would be good.

Saturday, June 10, 2017

June 10 - From Pillars to Porch

A Day of Concrete Progress - 


Two professional concrete guys from neighboring congregations were here to provide expertise and professional skill for the project. We are grateful to Sonny Johnson of the Minneapolis congregation and Jon Parks of the Cokato congregation who provided much appreciated energy and skill on this hot, windy Saturday.


The very visible, decorative pyramid-shaped pillars that support the portico was the object of Sonny's attention. Earlier in the week Sam was visiting with Sonny on the phone, picking the expert's brain for tips on assuring a professional look to the pillars. After considerable time spent explaining, Sonny finally said, "Tell you what. I will come to the church Saturday morning." Sam did not protest and Sonny came.



Jon Parks has spent his entire working life in the concrete business. He poured his talents and energy into guiding the back porch floor.
Thanks to both of these brothers for their expertise and diligent efforts. Concrete work is heavy labor.



The ready-mix truck was a little behind schedule so Sonny had a chance to entertain the assembly with stories. Here he is holding court from his pickup bed.









Then the truck is sighted. Let the fun begin.

Concrete pours are exciting. The trucks rumble in, the mud slides down the chute and bodies scramble hither and thither to either move the mix where it needs to go or get out of the way.
The truck arrives on the scene and the workers are ready and waiting.



Sam oiled the inside of the forms for the pillars. This will release the form when it is time to remove it. Just like greasing a cake pan, I think. I hope it works.

Sam holds the rebar frame in place, the mud avalanches down the chute and Brent uses his long ago developed butter churning skills to ram the poker through the thick ooze, encouraging it to fill each nook in the form.
Bob crawls around tapping on the form with a mallet, further inspiring the mud to get into the proper spaces. The expression on Brent's face reflects the ease with which the wooden prod glides up and down, in and out of the gravel, cement and water mix.

After the concrete has set up sufficiently, Sonny and Sam carefully remove the mold from the topmost piece of the structure.

Sonny then uses a mix of portland cement and fine sand to stir up a thin batter that is applied to the exposed side walls. Watching Sonny's dexterity with the small hand trowel makes me certain that he could have succeeded well icing cakes.



Out Behind the Building - 


When the mud starts to flow, many hands and feet are needed to quickly get the mud wither it needs to go. Mark is guiding the chute and flashing hand signals to the truck driver. Sam, Brian and Eric rake the mix into place. After the first section is smoothed out, the operation shifts down one more section.
Pouring a slab the size of the back porch requires significant planning and careful setup.
The far end of the floor is already in place and is at the proper height. The pipe in the foreground is resting on wooden stakes that were planted the night before such that, when the pipe is placed on them, the top of the pipe is at the top-of-floor height. Those wooden stakes have a couple of nails driven in on an angle to keep the pipe in place. Jon, on the far end of the long 2x4 screed, works with Brent to level the concrete at the proper elevation. Watching Jon makes me think that this line of work likely develops excellent core muscles and probably would be a good workout for ballet dancers and gymnasts. Sam and Brian push, pull and otherwise cajole the concrete in place so the screed operators have enough mud to get to height but not so much that they cannot move the screed efficiently. The concrete mix is heavy and does not go running into place without a lot of muscle.



While the chaos whirls around him, Sam the multi-tasker adds a phone call to his immediate attention. This time he actually took the luxury of using one hand to hold the phone rather than just leave it poised on his shoulder while he shoveled concrete.

Tall Sam uses a hammer to intimidate the concrete. A former workmate of mine used the phrase 'pounding sand' to describe effort expended on unprofitable activities. This experience came to mind as I watched Sam flail away at the mud. Actually, he is making the wooden pipe support stakes disappear, driving them nearer China.



Fighting the Wind -




Saturday was windy. Very windy.
Leaves, dust and assorted debris blew into the porch even as the concrete was being poured.

Jon not only oversaw the pouring operation, he also headed up the cleanup, scraping the junk off as carefully as possible, then smoothing the mud again.

Bob tried fighting wind with wind. Jon is doing some final troweling, not being forced to kneel facing the corner as punishment for bad behavior.












Meanwhile on the Inside -
Kevin installed insulation. Some of it he had the opportunity to install several times as the insulation did not want to adhere to the glue he had applied. He persevered, however, and eventually the insulation behaved properly and stayed in place.

Levi and Mark were among the insiders who also applied insulation.

Friday evening Glenn was insulating water pipes - the hot water lines to keep the water hot and the cold water lines to keep them from sweating in humid weather.




















Before Logging Off - 

The evaluation of pew concepts continues. Another possibility is being considered.


Saturday, June 3, 2017

June 3 -Wildlife, Portico and Drywall

Wildlife - 
While I have not personally seen any wildlife prowling in the church yard, I did see the evidence of it being there. When the mud dried out, clear footprints were left behind. Not being a wildlife expert, I only speculate without confidence on the critters that left these prints. I suspect a deer is responsible for these ones.



I do not think a deer left these impressions.
















Portico - 
Some days ago, I noticed this construction outside the front door. 


It maybe easier to see looking from the inside. I recognized the resemblance to a hitch rail for tying horses, but it was too short for that. Unable to cipher it on my own, I requested assistance. Ken informed me that it is the center line for the portico.
It has since disappeared, so I wondered if the portico idea has been abandoned.


Much to my relief, I learn that it has not. Actually, factually progress has been recorded in making it become a reality. For example, pyramids have been delivered.
You may ask, what is the connection between pyramids and porticoes? These are the forms for the concrete pillars which will be the base for the supporting posts.


This is a look inside. Being close with a wide angle lens distorts the dimensions. They are angled on the inside as well as the outside. It is rumored that an old time concrete finisher is being lured out of retirement to help with filling them with mud.


















Drywall -
The inspector gave the go ahead to cover some of the walls, so that accounted for most of Saturday's activity. Three teams work on three walls.

Aare and Ami muscle a sheet into place. The wall behind the pulpit is pretty tall. I was not able to watch the top of the wall being covered but I do not think they could do it using those ladders.

Hang the panel then trim for the window opening. Cutting Sheetrock generates a mess of dust.





 Aare reached the end of his arm from the top of the ladder putting in the top corner screw on this sheet.

Dave and Glenn grunt a size large panel into  place.














Using a scrap of plywood and a stubby 2x4 as a lever and fulcrum, the heavy sheet is jockeyed into position. Phil on the scaffold calls out directions.
A little higher. A little more yet. There!
Then the screw gun rattles a fastener in and the muscle guys can relax a bit.